Paul R. Leveriza
E: paul.leveriza@alumni.harvard.edu
M: 4088236898 Cell
A: 1469 Plymouth Ave, San Francisco, CA 94112
Education
2005 Masters in Architecture II (Advanced Degree in Architecture) Harvard University, with Distinction
2001 Bachelors in Architecture (Professional Degree) California College of the Arts, with High Distinction
Certifications
USGBC LEED AP, BD+C
I. EXPERIENCE
A. Senior Project Designer at RAD Urban. Sept 2016 - Sept 2018 (2 Years)
B. Senior Project Designer at Perkins + Will, San Francisco Office, September 2014 - September 2016 (2 Years)
Key Projects
2016 San Francisco International Airport Consolidated Administration Campus (110,000 SF Office Building at SFO) Finished Construction 2018
C. Project Design Lead at Perkins + Will, San Francisco Office, July 2005 – 5 Years
Working Directly with the Design Principal as lead designer for the project I am in direct interaction with the client and am responsible for presentation of design concepts and ideas using plans and 3D Visualization. I am also involved in the development of construction details, consultant coordination for interiors, and the production of Construction Documents.
Key Projects:
2012 UC Berkeley Haas School of Business School Building, 60,000 SF, New Building (in Construction Documents)
2012 Cupertino Civic Center Masterplan Framework Development – Perkins and Will (Architect of the current Cupertino Library and Community Hall, was hired to reinvision the Cupertino Civic Center and identify potentials for future development and growth while addressing more short term issues such as the existing parking shortage. I produced three options for development and communicated the analysis and schemes through multiple maps and diagrams.
2010-11 Presidio Officers' Club, Presidio, San Francisco; adaptive reuse, renovation and historic preservation of the Presidio Officers Club into a new venue(under construction)
ii. Role: Architect III - I assisted the Project Architect with the production of 100% construction documents as well as consultant coordination with the interiors of the project. These included highly technical spaces such as a Movie Theater and Recording Studio (Pixar)
Key Projects:
2009-10 Pixar II Animation Studios Digital Production Facility, New Building, 80,000 SF, Emeryville, CA, (w/ Allied Works Architecture); Primarily involved with the interior planning and detailing of Public Spaces, including a Movie Theater, Conference Rooms, Offices and Café. (Constructed 2011)
2008-09 Presidio Landmark, Adaptive Reuse of a Historic Navy Hospital into High End Residential Apartments, Presidio, San Francisco (Interior Design and detailing of common areas, including main lobby, Finished Construction)
2008 Seawall Lot 337, Mission Bay, San Francisco, CA (Conceptual Design, Master Planning and Visualization, ongoing)
2007 The San Francisco Transbay Terminal and Tower Design Competition, w/ Richard Rogers, London, UK 1,000,000 SF (Conceptual Design and Visualization)
2006 The Yards, Parcel L, Washington DC. – concept development of a residential block
2005 Treasure Island Masterplan
D. A+D, Architecture and Design January 2001 – January 2003 (2 years 1 month)
i. Role: Designer
Assisted the Firm Principal in code research, concept development and production of 100 % construction documents
Key Projects:
2002 Citibank Bank Branch Tenant Improvement, Castro Valley, CA (Finished Construction) - Under the firm principal, I was involved in all phases of the project which included the development of concepts and schemes, as well as produced 100% construction documents for the project and construction administration.
2001-2002 Assisted the Firm Principal to execute several residential renovations and additions.
Skills & Expertise